The records show bigsurhalfmarathon.org was tested for operability 2 times over the 329 day duration beginning April 17, 2024. On January 27, 2025, bigsurhalfmarathon.org returned a code 200, the latest of 2 instances of uptime from aggregate checks performed. Inspections carried out as of March 13, 2025, revealed no incidents of inaccessibility for bigsurhalfmarathon.org. The responses received indicate that there were no error statuses as of March 13, 2025. The response time of bigsurhalfmarathon.org averaged 1.859 seconds, with a recorded time of 1.804 seconds on January 27, 2025.